Over the last six weeks we've been actually unfortunate with a run of issues (2 separate random leaks and a damaged CH pump) and the response has been sensible, both from the ladies allocating the jobs and the engineers. https://ask.xn--mgbg7b3bdcu.net/user/lifteast04