1

The Penmann team finalises comprehensive HVAC refurbishment for Nutricia’s production facility in Liverpool supporting FSI Phase 1 & 2

News Discuss 
Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production criteria. The scope included the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://hubwebsites.com/story22089492/penmann-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story